How we work

Four movements,
no surprises

No scope creep, no silence between stages. You will always know what is happening on your site this week and what happens next.

Project timeline at a glance

01

Consultation

Week 1 · No fee

02

Design

Weeks 2–6

03

Execution

Weeks 7–18

04

Handover

Final week, then 30 / 90 / 365 days

The four stages in detail

  1. 01

    Consultation

    Week 1 · No fee

    We visit your site, measure it ourselves and spend two hours understanding how your household actually runs. You leave with an honest budget band, a realistic timeline and a written scope — before any money changes hands.

    This is a working session, not a sales call. We want to know who cooks, who works from home, where the family actually gathers in the evening, and what irritated you about the last place you lived. We also say the difficult thing early: if your budget and your brief do not meet, you will hear it in this meeting rather than at the third revision.

    What you receive

    • Independent site measure — we do not rely on the builder's drawing
    • Written scope of work
    • Honest budget band, with the assumptions behind it stated
    • Realistic programme, including the weeks that will be disruptive

    What we need from you

    A floor plan if you have one, your possession or move-in date, a rough budget range, and any images that describe the feeling you are after. None of it is mandatory.

  2. 02

    Design

    Weeks 2–6

    Layouts, elevations, 3D walkthroughs and a physical material board you can hold. Two rounds of revision are built in. Nothing goes to the factory until you have signed the drawing and the line-item BOQ.

    We test three or four plan options against how you actually move through a day before committing to one. Only once the plan is settled do we choose finishes — proportion before finish, always. The material board is physical: you carry it to the window and see the veneer in your own daylight, not in a render.

    What you receive

    • Three to four tested layout options with circulation diagrams
    • Elevations and detailed joinery drawings
    • 3D walkthroughs of the principal rooms
    • A physical material board — stone, veneer, textile, metal, paint
    • Four-tier lighting plan on separate circuits
    • Line-item BOQ with rates locked for the contract term

    What we need from you

    Consolidated feedback at each of the two review rounds, and a signature on the final drawing set and BOQ. Decisions made here are inexpensive; the same decisions made in week fourteen are not.

  3. 03

    Execution

    Weeks 7–18

    Joinery is manufactured in our workshop while civil, ceiling and services work runs on site. One project manager, weekly photo reports, a live schedule you can open on your phone, and a site you are welcome to walk any day.

    Running the workshop and the site in parallel is what compresses the programme. While the wardrobes are being cut, the ceilings and the wiring are going in. Every panel is drawn as a shop drawing before it is cut, and work passes five quality gates — layout, carcass, installation, finish and snag — each signed off before the next trade is allowed to start.

    What you receive

    • Civil work, false ceilings, electrical and plumbing coordination
    • In-house manufacture of all modular joinery
    • Weekly photo reports and a live shared schedule
    • Five quality gates, each signed off before the next trade begins
    • Written approval sought before any variation reaches your invoice

    What we need from you

    Availability for a site walk when a gate is reached, and prompt sign-off on any variation. You are welcome on site any day — no appointment, no minder.

  4. 04

    Handover

    Final week, then 30 / 90 / 365 days

    Deep clean, styling, a joint snag walk and a bound handover file: warranties, appliance manuals, paint codes, fabric references and service contacts. We return at 30, 90 and 365 days to check the house has settled well.

    A handover is not a set of keys. We snag the house with you rather than for you, and nothing is signed off until your list is closed, not ours. The bound file matters more than clients expect: three years on, when a wall needs touching up or a shutter needs matching, the paint code and the veneer batch are written down.

    What you receive

    • Deep clean and full styling before you walk in
    • Joint snag walk — your list, closed before sign-off
    • Bound handover file: warranties, manuals, paint codes, fabric references
    • Manufacturer warranties registered on your behalf
    • Scheduled revisits at 30, 90 and 365 days

    What we need from you

    An unhurried couple of hours for the snag walk. Bring the most critical member of the household — they always find the thing we missed.

Quality control

Five gates,
each signed off

No trade is allowed to start until the previous gate has been cleared. It is slower on paper and considerably faster in practice, because nothing has to be opened up and redone.

  1. Layout gate — setting out checked against the signed drawing before any fixing.
  2. Carcass gate — joinery boxes checked for square, level and service cut-outs.
  3. Installation gate — alignment, shutter gaps and hardware operation.
  4. Finish gate — polish, paint, edge quality and colour consistency under site lighting.
  5. Snag gate — joint walk with you; your list closed before sign-off.

Timelines and terms

Common
questions

How long does a project take from design to handover?

A premium 3BHK apartment usually runs 12 to 16 weeks from design sign-off to handover. A full villa runs 20 to 30 weeks. Design development itself takes three to five weeks, including layouts, 3D walkthroughs, material boards and the final BOQ.

What happens if the cost changes mid-project?

It does not change unless you change it. Rates are locked for the contract term and no variation reaches your invoice without your written approval first. If you ask for something new mid-project we price it, you approve it, and only then does it get built.

Can I visit the site and the workshop during execution?

Yes. Your site is open to you any working day without an appointment, and you do not need to give notice or be escorted. If you want to see joinery being made for your home, call ahead and we will arrange a time when the relevant work is actually on the bench.

What if I find a defect after handover?

Call the service desk. In-house modular joinery carries a 10-year structural warranty and a 1-year comprehensive service warranty, and we return at 30, 90 and 365 days regardless of whether you have reported anything.

How many revisions are included in the design stage?

Two full rounds of revision are built into the fee. In practice we keep working until the plan is right — the two rounds are a structure for consolidating your feedback, not a limit we use to start charging you.

Movement one
costs you nothing

The first consultation is free, on your site, and ends with a written scope and an honest budget band. Design fees only begin once you appoint us.